Eurocoms working closely with the M&E contractor designed, supplied, installed and commissioned an Excel networking solution for a new client who had specific requirements to enable their bespoke solution to perform to the highest standards.
Toca Social describe their venue as “The world’s first social, dining and football experience, play, dine and score! Immersive gaming, delicious food and five-star cocktails, it’s a football match made in heaven. It’s a night-out with friends like no other and day-out with the family they’ll never forget, so enjoy it, drink it in!”
Although challenging our design team and on-site management determined that the solution would be both Category 6 and 6A cabling to B2CA rating to support the various hardware and technology the client would be using for this unique world first experience.
Construction issue drawings were regularly changed (client design changes), various drawings provided by both the IT consultant and end client, which meant our teams had to do regular overlays and updating of CAD drawings. All in a days work!
The project consisted of;
Eurocoms produced schematics and cabinet elevation drawings which formed an overall technical submission that was distributed to the many parties involved to ensure the project progressed and was delivered correctly and on time.
All works on site were completed as one phase given the extremely tight programme all contractors involved were being asked to work to, both first fix and second fix cabling was undertaken in various areas to ensure all cables were installed within the unique building structure allowing the builders to close up ceilings, walls and containment solutions ready for hand over to the client.
The cabling was installed at both high level on tray work (4-5m) and under raised flooring on new containment to supply the many pieces of technology the client was installing (motion cameras, EPOS, wireless charging stations, TV’s, interactive screens, projectors, environmental monitors, CCTV, access control and BMS).
Director Dan Ford made several visits to site during the install to offer advice and discuss the many changes the installation team was faced with. Our on-site team were a credit to our company, and we have received fantastic feedback from our client who offered their gratitude to our site teams for the commitment, enthusiasm, and standard of work. Upon completion of the first and second fixing, Eurocoms certified the installation to the highest of standards with Fluke DSX5000 series testers.